Limbo?

May. 14, 2015

Back to Project:

In February, I found out that a contract had been put on the Broadway and the decaying film theatre (The Esquire) across the street.  Ownership was to change at the end of March.

It is the middle of May, and my last information was that the ownership had not transferred yet.  So, the building being in limbo after the harsh winter, and the spring rains, means even less maintenance will be done. (Like emptying the 55 gallon trash can full of water on the second floor over the lobby).  

So, we wait to see, if the ownership will transfer, and what the new owner's plan will be..... 

  • Image: 
    Image Description: 
    Black Mold growing on the gypsum board layer that is holding water that has leaked thru the roof, and thru the plaster and lathe ceiling.